Water Heater Sizing - BTU
Tools In-app purchases Contains ads
Calculate water heater BTU requirements. Gas, electric, heat pump. Offline.
- Downloads
- 48+
- on Google Play
- Price
- Free
- In-app purchases
- Updated
- Sep 16
- 2026 · v1.0.6
Screenshots
About Water Heater Sizing - BTU
Water Heater Sizing Calculator helps you calculate required BTU/hour capacity for any water heating application. Instantly determine heater size for gas (natural gas or propane), electric, or heat pump water heaters based on flow rate and temperature rise. Support efficiency percentages for fuel types: 80% for natural gas/propane, 95% for electric resistance, 250% COP for heat pump systems. Works 100% offline on the job site. Designed for sizing water heaters to meet simultaneous hot water demand.
FEATURES
• 4 Fuel Types: Natural gas (80% efficiency), propane (80% efficiency), electric resistance (95% efficiency), and heat pump systems (250% coefficient of performance)
• Temperature Input: Fahrenheit or Celsius selection for global compatibility
• Flow Rate Support: GPM (US gallons per minute) and L/min input options
• Temperature Rise Calculation: Automatic calculation from inlet and outlet temperatures
• kW Conversion: Automatic kilowatt conversion for electric heater sizing
• Simultaneous Demand: Account for multiple hot water draws simultaneously
• Standard Tank Sizes: Reference standard 30, 40, 50, 75, and 100-gallon tank capacities with BTU ratings
HOW IT WORKS
1. Select fuel type (natural gas, propane, electric, or heat pump)
2. Enter water flow rate (GPM) required by fixtures
3. Enter inlet and outlet temperatures or temperature rise
4. App calculates required BTU/hour and recommended tank size
5. Export sizing recommendation to PDF for equipment selection
PERFECT FOR
• Plumbers and HVAC technicians sizing water heaters
• Plumbing contractors and estimators
• Mechanical engineers designing hot water systems
• Home builders selecting appropriate equipment
• Facilities managers replacing water heaters
• Plumbing inspectors verifying system design
PRO UPGRADE ($2.99 one-time)
• Unlimited water heater sizing calculations
• Save sizing designs to history for future reference
• PDF export with BTU calculation and efficiency ratings
• Dark theme for field readability
• No ads
STANDARDS & COMPLIANCE
Standard BTU/h formula: BTU/h = GPM x Temperature Rise (°F) x 500 / Efficiency, Fuel efficiency ratings per manufacturer specifications (80% gas, 95% electric, 250% COP heat pump), Energy Factor (EF) calculations for comparing heater models, Standard residential hot water demand per ASHRAE guidelines.
PERFECT FOR
• Plumbers and HVAC technicians
• Mechanical engineers and estimators
• Plumbing contractors
• Home builders and renovators
• Facilities and building managers
• Plumbing inspectors
OFFLINE & PRIVACY
• Works 100% offline - calculate heater sizes anywhere
• No account required - instant access without signup
• No data collection - all calculations stored locally
• No internet dependency
Part of PlumbTools Suite - professional plumbing and HVAC calculator tools. Calculate water heater BTU requirements accurately, select right-sized equipment, and meet simultaneous hot water demand with precise heater sizing.
FEATURES
• 4 Fuel Types: Natural gas (80% efficiency), propane (80% efficiency), electric resistance (95% efficiency), and heat pump systems (250% coefficient of performance)
• Temperature Input: Fahrenheit or Celsius selection for global compatibility
• Flow Rate Support: GPM (US gallons per minute) and L/min input options
• Temperature Rise Calculation: Automatic calculation from inlet and outlet temperatures
• kW Conversion: Automatic kilowatt conversion for electric heater sizing
• Simultaneous Demand: Account for multiple hot water draws simultaneously
• Standard Tank Sizes: Reference standard 30, 40, 50, 75, and 100-gallon tank capacities with BTU ratings
HOW IT WORKS
1. Select fuel type (natural gas, propane, electric, or heat pump)
2. Enter water flow rate (GPM) required by fixtures
3. Enter inlet and outlet temperatures or temperature rise
4. App calculates required BTU/hour and recommended tank size
5. Export sizing recommendation to PDF for equipment selection
PERFECT FOR
• Plumbers and HVAC technicians sizing water heaters
• Plumbing contractors and estimators
• Mechanical engineers designing hot water systems
• Home builders selecting appropriate equipment
• Facilities managers replacing water heaters
• Plumbing inspectors verifying system design
PRO UPGRADE ($2.99 one-time)
• Unlimited water heater sizing calculations
• Save sizing designs to history for future reference
• PDF export with BTU calculation and efficiency ratings
• Dark theme for field readability
• No ads
STANDARDS & COMPLIANCE
Standard BTU/h formula: BTU/h = GPM x Temperature Rise (°F) x 500 / Efficiency, Fuel efficiency ratings per manufacturer specifications (80% gas, 95% electric, 250% COP heat pump), Energy Factor (EF) calculations for comparing heater models, Standard residential hot water demand per ASHRAE guidelines.
PERFECT FOR
• Plumbers and HVAC technicians
• Mechanical engineers and estimators
• Plumbing contractors
• Home builders and renovators
• Facilities and building managers
• Plumbing inspectors
OFFLINE & PRIVACY
• Works 100% offline - calculate heater sizes anywhere
• No account required - instant access without signup
• No data collection - all calculations stored locally
• No internet dependency
Part of PlumbTools Suite - professional plumbing and HVAC calculator tools. Calculate water heater BTU requirements accurately, select right-sized equipment, and meet simultaneous hot water demand with precise heater sizing.
What’s new
Version 1.0.6 · Updated September 16, 2026
Added a link to TradeTools — the one-app version of this calculator and 61 more, for HVAC, electrical, plumbing, fire protection, solar and carpentry. Nothing else changed.
Alternatives to Water Heater Sizing - BTU
Looking for apps like Water Heater Sizing - BTU? Here are 6 similar Android apps on Google Play. All of them are free to download.
-
Box Fill NEC 314 Calculator
-
Superheat Calculator - HVAC
-
Conduit Fill NEC Chapter 9
-
Grounding NEC 250 Calculator
-
HVAC Hydronic Pipe Calculator
-
Wire Size NEC 310 Calculator
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| Water Heater Sizing - BTU | – | Free | 10+ | Sep 16, 2026 | |
| Box Fill NEC 314 Calculator | – | Free | 500+ | Sep 16, 2026 | Compare |
| Superheat Calculator - HVAC | – | Free | 1,000+ | Sep 16, 2026 | Compare |
| Conduit Fill NEC Chapter 9 | – | Free | 100+ | Sep 16, 2026 | Compare |
| Grounding NEC 250 Calculator | – | Free | 100+ | Sep 16, 2026 | Compare |
| HVAC Hydronic Pipe Calculator | – | Free | 100+ | Sep 16, 2026 | Compare |
| Wire Size NEC 310 Calculator | – | Free | 500+ | Sep 16, 2026 | Compare |