Makely: DIY Project Planner
Saidmuhammad Brjanov Lifestyle iPhoneiPadiPod touch
Makely: DIY Project Planner is a free Lifestyle app for iPhone and iPad by Saidmuhammad Brjanov. Requires iOS 17.0. Updated July 11, 2026.
- Price
- Free
- on the App Store
- Size
- 24 MB
- Age 4+
- Updated
- Jul 11
- 2026 · v1.0.2
Screenshots
About Makely: DIY Project Planner
Stop pausing, rewinding, and squinting at someone else's hands. Makely turns any DIY video, photo, or problem into a real, organized project — with the exact materials, tools, and step-by-step plan you need to build it. WHAT MAKELY DOES - Save any DIY video, in one tap. See a reel, short, or pin on Instagram, TikTok, YouTube, or Pinterest? Tap Share → Makely. Open the app and your project is extracted automatically. - Materials & steps, figured out for you. AI watches the video and pulls out every material, tool, measurement, and instruction — including exact brand names when they're visible on the label. - Any how-to article, decoded. Paste a link to a blog or DIY site and Makely lifts the materials, tools, and steps into a clean, editable project. - Snap a photo, get a plan. Point your camera at a piece of furniture, a room, or a finished project and Makely drafts the whole build. - Something broken? Fix It. Describe the problem or photograph it — a leaking pipe, a cracked tile, a broken hinge. Makely asks a couple of questions, diagnoses it, and turns the answer into a repair plan with a shopping list. It flags hazards and tells you when to call a licensed pro. - Stuck for ideas? Ask Makely. Describe what you want to build — "a floating walnut desk," "raised garden beds for a 4x8 plot" — and Makely drafts a full materials list and plan in seconds. - Smart shopping lists. Check off materials as you shop and see what you've already bought. - Find materials online. Tap any material or tool to search for it on Amazon. - Project Mode. Hands-free, step-by-step instructions with the actual video clip for each step — pause, replay, slow down, or go fullscreen while your hands are busy. - Stay organized, stay motivated. Build collections for the kitchen remodel, the garden upgrade, the bathroom refresh. Track what you own, what you need, and the rough cost. Earn badges as you finish projects. MAKELY PRO Makely is free to download — start with 3 free project extractions to try the magic. Makely Pro unlocks 100 Magic Links every month (up to 30 a day), longer video support, and all Pro features, starting with a 7-day free trial: - Makely Pro Monthly: $7.99 - Makely Pro Annual: $59.99 (save 37%) Payment will be charged to your Apple ID account at the confirmation of purchase. Subscriptions automatically renew unless canceled at least 24 hours before the end of the current period. Your account will be charged for renewal within 24 hours prior to the end of the current period. You can manage and cancel your subscriptions at any time in iOS Settings → Apple ID → Subscriptions. Any unused portion of the free trial will be forfeited when you purchase a subscription. IMPORTANT Makely's plans are AI-generated. Always verify materials, measurements, and safety before you build. For gas, electrical, structural, or major water work, consult a licensed professional. As an Amazon Associate, we earn from qualifying purchases at no extra cost to you. Privacy Policy: https://sites.google.com/view/makely/privacy-policy Terms of Use: https://sites.google.com/view/makely/terms-of-use Questions? [email protected]
What’s new
Version 1.0.2 · Updated July 11, 2026
What's new in Makely: 1. Fix It — for when something's broken. Describe the problem or snap a photo — a leaking pipe, a cracked tile, a broken hinge. Makely asks a couple of questions, works out what's wrong, and turns it into a step-by-step repair plan with a shopping list. It flags hazards and tells you when to call a licensed pro. 2. Snap a photo, get a project. Point your camera at a piece of furniture, a room, or a finished build. Makely drafts the full materials, tools, and steps — add a note to guide it if you want. 3. Exact brand names. When a brand is clearly visible on a label in the video, Makely captures it — so you can find the exact product, not just "wood glue." 4. Badges. Earn illustrated badges as you extract, build, and finish projects. 5. Sharper extraction. The AI is no longer tuned only for renovation — accuracy is noticeably better for crafts, woodworking, furniture, and repairs. 6. Smoother sharing. Major reliability fixes for the Share-to-Makely flow from Instagram, TikTok, and YouTube. Thanks for using Makely. Send feedback or ideas to [email protected] — we read everything.
App privacy
The developer, Saidmuhammad Brjanov, reported these privacy practices to Apple.
Data Linked to You
The following data, which may be collected and linked to your identity, may be used for the following purposes:
- User Content: Photos or Videos, Other User Content
Used for: App Functionality
Alternatives to Makely: DIY Project Planner
Looking for apps like Makely: DIY Project Planner? Here are 6 similar apps on the App Store. The highest rated is SnapToBuild: DIY Planner (5.0/5), and all 6 are free to download.
-
DIY Hero - Provider
-
DIYer
-
Tilswall: DIY Projects & AI
-
HouseCalls DIY
-
Buildr – DIY Project Planner
2.0
-
SnapToBuild: DIY Planner
5.0
| App | Rating | Price | Last updated | Compare |
|---|---|---|---|---|
| Makely: DIY Project Planner | – | Free | July 11, 2026 | |
| DIY Hero - Provider | – | Free | Sep 9, 2024 | Compare |
| DIYer | – | Free | Apr 30, 2026 | Compare |
| Tilswall: DIY Projects & AI | – | Free | Jul 25, 2026 | Compare |
| HouseCalls DIY | – | Free | Jun 18, 2025 | Compare |
| Buildr – DIY Project Planner | 2.0 / 5 (1) | Free | Apr 14, 2026 | Compare |
| SnapToBuild: DIY Planner | 5.0 / 5 (3) | Free | Oct 16, 2026 | Compare |