SiteDiary Pro - Logs to Gantt
Business In-app purchases
Construction daily report & automatic Gantt project tracker for supervisors.
- Downloads
- 43+
- on Google Play
- Price
- Free
- In-app purchases
- Updated
- Jul 31
- 2026 · v1.0.0
Screenshots
About SiteDiary Pro - Logs to Gantt
SiteDiary Pro is the construction site diary (daily log) and project scheduling app built for site managers, foremen, and contractors who need one place to log daily progress and track it against the master construction program.
Stop juggling paper diaries and logs, spreadsheets, and separate scheduling software. SiteDiary Pro links your daily site log directly to a live construction schedule, so every diary entry you log automatically updates project progress, production rates, and cost tracking — with no manual re-entry.
WHY SITE TEAMS CHOOSE SITEDIARY PRO
📋 DAILY SITE DIARY / CONSTRUCTION LOG
• Capture weather (auto-fetched or manual), deliveries, visitors, unusual events, and daily notes
• Log Engineer Instructions and RFIs with structured, searchable action logs
• Track delays with duration impact and cause, straight into your delay register
• Record plant, labour, and material resource usage against each activity
📊 GANTT CHART & CRITICAL PATH SCHEDULING
• Interactive, drag-to-scroll Gantt chart with tablet split-pane view
• Finish-to-start dependency logic — successor activities shift automatically
• Working-day aware scheduling (Mon–Fri, Mon–Sat, or 7-day calendars)
• One-tap Critical Path Method (CPM) overlay to instantly see which activities have zero slack and are driving your completion date
• Track up to 250 activities per project
📈 PRODUCTION & COST ANALYTICS
• Automatic Unit Economic Rate (cost per unit produced)
• Daily and cumulative production rate tracking
• Total expenditure calculated live from resource rates and quantities
🗂 MULTI-PROJECT MANAGEMENT
• Run multiple job sites from one app with full historical diary navigation per project
• Unlimited plant, labour, and material resource registration
☁️ OFFLINE-FIRST WITH CLOUD SYNC
• Full functionality without signal on remote construction sites
• Background sync keeps your records backed up and available across devices
📄 PROFESSIONAL PDF REPORTS
• Export site diary / log and Gantt reports as clean, print-ready PDFs
• Critical path highlighted for client and stakeholder reporting
WHO IT'S FOR
Site agents, foremen, project managers, quantity surveyors, and small-to-mid-size contractors who need bulletproof, auditable daily records tied to a real schedule — not a static spreadsheet.
PRICING & FREE TRIAL
SiteDiary Pro offers a 14-day free trial (1 project). After the trial:
• Standard: up to 5 concurrent projects
• Pro: unlimited concurrent projects
Subscriptions are billed via Google Play and renew automatically unless cancelled at least 24 hours before the renewal date. Manage or cancel anytime in your Google Play account subscription settings. Local pricing may vary by region.
Download SiteDiary Pro and turn your daily construction site log into a live, auditable project schedule. The User Manual is available at: https://horizonforgeapps.github.io/SiteDiary-Pro/SiteDiary_Pro_User_Manual.html
Stop juggling paper diaries and logs, spreadsheets, and separate scheduling software. SiteDiary Pro links your daily site log directly to a live construction schedule, so every diary entry you log automatically updates project progress, production rates, and cost tracking — with no manual re-entry.
WHY SITE TEAMS CHOOSE SITEDIARY PRO
📋 DAILY SITE DIARY / CONSTRUCTION LOG
• Capture weather (auto-fetched or manual), deliveries, visitors, unusual events, and daily notes
• Log Engineer Instructions and RFIs with structured, searchable action logs
• Track delays with duration impact and cause, straight into your delay register
• Record plant, labour, and material resource usage against each activity
📊 GANTT CHART & CRITICAL PATH SCHEDULING
• Interactive, drag-to-scroll Gantt chart with tablet split-pane view
• Finish-to-start dependency logic — successor activities shift automatically
• Working-day aware scheduling (Mon–Fri, Mon–Sat, or 7-day calendars)
• One-tap Critical Path Method (CPM) overlay to instantly see which activities have zero slack and are driving your completion date
• Track up to 250 activities per project
📈 PRODUCTION & COST ANALYTICS
• Automatic Unit Economic Rate (cost per unit produced)
• Daily and cumulative production rate tracking
• Total expenditure calculated live from resource rates and quantities
🗂 MULTI-PROJECT MANAGEMENT
• Run multiple job sites from one app with full historical diary navigation per project
• Unlimited plant, labour, and material resource registration
☁️ OFFLINE-FIRST WITH CLOUD SYNC
• Full functionality without signal on remote construction sites
• Background sync keeps your records backed up and available across devices
📄 PROFESSIONAL PDF REPORTS
• Export site diary / log and Gantt reports as clean, print-ready PDFs
• Critical path highlighted for client and stakeholder reporting
WHO IT'S FOR
Site agents, foremen, project managers, quantity surveyors, and small-to-mid-size contractors who need bulletproof, auditable daily records tied to a real schedule — not a static spreadsheet.
PRICING & FREE TRIAL
SiteDiary Pro offers a 14-day free trial (1 project). After the trial:
• Standard: up to 5 concurrent projects
• Pro: unlimited concurrent projects
Subscriptions are billed via Google Play and renew automatically unless cancelled at least 24 hours before the renewal date. Manage or cancel anytime in your Google Play account subscription settings. Local pricing may vary by region.
Download SiteDiary Pro and turn your daily construction site log into a live, auditable project schedule. The User Manual is available at: https://horizonforgeapps.github.io/SiteDiary-Pro/SiteDiary_Pro_User_Manual.html
What’s new
Version 1.0.0 · Updated July 31, 2026
An update introduced UUIDs in PDF exports. PDFs are now clean again.
User reviews
fantastic app
An excellent app for planning and keeping track of your project/s. Includes working offline functionality, and allows export/print to PDF.
Easy to use project tracker and cost effective too. Exactly what I needed on site to keep accurate daily records and track progress. The app converts your daily diary input into live feedback in the form of progress bars on the gantt chart and also tracks cost-per-unit and production rates. It also captures cumulati...
Alternatives to SiteDiary Pro - Logs to Gantt
Looking for apps like SiteDiary Pro - Logs to Gantt? Here are 3 similar Android apps on Google Play. All of them are free to download.
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| SiteDiary Pro - Logs to Gantt | – | Free | 10+ | Jul 31, 2026 | |
| SiteRate Builder Calculator SA | – | Free | 1+ | Aug 31, 2026 | Compare |
| Verbatio: Offline Transcribe | – | Free | 50+ | Aug 15, 2026 | Compare |
| SA Bond & Property Calculator | – | Free | 10+ | Jul 22, 2026 | Compare |