AppPage.net

Screenshots

  • Countryside watch face screenshot 1
  • Countryside watch face screenshot 2
  • Countryside watch face screenshot 3
  • Countryside watch face screenshot 4
  • Countryside watch face screenshot 5
  • Countryside watch face screenshot 6
  • Countryside watch face screenshot 7
  • Countryside watch face screenshot 8

About Countryside watch face

DESCRIPTION

Introducing Countryside, a charming and picturesque digital watch face designed for Wear OS smartwatches. Inspired by an illustrated style, Countryside brings a touch of whimsy and natural beauty to your wrist.

With its delightful hand-drawn elements, Countryside captures the essence of idyllic landscapes and tranquil moments.

Timetable, battery bar, date, steps, and the shortcut are elegantly integrated into the design, providing both functionality and visual appeal. Simply tap the date to open the calendar and the timetable to open the alarms.

The Wear OS watch face also features an always on display mode optimised for low battery consumption.

WATCH FACE FEATURES

• Illustrated style
• Date
• Battery bar
• Custom shortcut
• Calendar shortcut (tapping date)
• Alarm shortcut (tapping time)

CONTACTS

Telegram: https://t.me/cromacompany_wearos

Facebook: https://www.facebook.com/cromacompany

Instagram: https://www.instagram.com/cromacompany/

E-mail: [email protected]

Website: www.cromacompany.com

What’s new

Updated September 25, 2026

Bugfix

User reviews

Daniel Chan
Daniel Chan
happy with this
SOORYA NARAYAN.S
SOORYA NARAYAN.S
Superb watch face ...keep going

Alternatives to Countryside watch face

Looking for apps like Countryside watch face? Here are 6 similar Android apps on Google Play. The highest rated is Wrist Tool with GPT for WearOS (4.5/5), and 3 of the 6 are free to download.

Countryside watch face vs. alternatives
App Rating Price Installs Last updated Compare
Countryside watch face – $1.49 100+ Sep 25, 2026
Wrist Tool with GPT for WearOS 4.5 / 5 Free 50+ Nov 25, 2022 Compare
Buzzing Bee Adventure Wear OS – Free 10,000+ Feb 16, 2026 Compare
Sunflalert Notifier for SFL – Free 10+ Nov 1, 2023 Compare
Nebula Watch Face – 1.49 USD 1,000+ Sep 5, 2026 Compare
Nexus – 1.49 USD 100+ Aug 19, 2024 Compare
Spectrum Watch Face Wear OS – 1.49 USD 500+ Sep 2, 2024 Compare

Compare Countryside watch face with the top alternatives: ratings, updates, ASO score and keyword gaps →

Similar apps on Google Play