Tiling Calculator
Darryl Jackson Tools In-app purchases Contains ads
Estimate tiles, adhesive and grout for any UK floor or wall tiling project.
- Downloads
- 114+
- on Google Play
- Price
- Free
- In-app purchases
- Updated
- May 6
- 2026 · v1.0.0
Screenshots
Save to PinterestAbout Tiling Calculator
Tiling Calculator estimates exactly how many tiles, bags of adhesive, and bags of grout you need for any floor or wall tiling project — built for UK tradespeople and DIYers.
Enter your room dimensions, pick a tile size from common UK presets, and the app does the rest. Add waste percentage, joint width, and unit prices to see total material costs in pounds.
KEY FEATURES
• Floor and wall tiling modes
• 14 UK retail tile size presets — mosaic, metro, 300×300, 600×600, 1200×600 and more
• Custom tile size with width, height, and thickness
• Configurable joint width (default 2mm wall, 3mm floor per BS 5385-1:2018)
• Waste allowance 0–25% (default 10% for straight lay)
• Adhesive coverage matched to BAL Single Part Flexible TDS — separate floor (5/4/3 m²/bag) and wall (10/7/5 m²/bag) rates by tile size
• Grout estimate using manufacturer formula (joint length × width × tile thickness × density 1.7 kg/L per Bostik TDS)
• Optional cost estimation with price-per-tile, price-per-bag inputs
• Clean breakdown of base tiles, waste tiles, and total
• Share results to text/email/messaging apps
CALCULATION ACCURACY
Built against UK industry standards: BS 5385-1:2018 wall and floor tiling, BAL adhesive technical datasheets, Bostik grout TDS, and TTA (The Tile Association) guidance. Tile size presets match Topps Tiles, Wickes, and B&Q retail standards.
WHO IT'S FOR
• Tilers and decorators sizing up jobs
• Home renovators planning bathrooms, kitchens, hallways
• Quantity surveyors estimating materials
• DIYers shopping at Wickes, B&Q, Topps Tiles, or trade merchants
OFFLINE READY
Calculate without an internet connection. Results saved nowhere — all numbers stay on your device.
DISCLAIMER
This calculator is a planning tool. Always cross-check critical material orders with your supplier or a qualified tradesperson. Wall mode does not subtract door or window openings — increase waste % or subtract openings manually for accurate net area.
Enter your room dimensions, pick a tile size from common UK presets, and the app does the rest. Add waste percentage, joint width, and unit prices to see total material costs in pounds.
KEY FEATURES
• Floor and wall tiling modes
• 14 UK retail tile size presets — mosaic, metro, 300×300, 600×600, 1200×600 and more
• Custom tile size with width, height, and thickness
• Configurable joint width (default 2mm wall, 3mm floor per BS 5385-1:2018)
• Waste allowance 0–25% (default 10% for straight lay)
• Adhesive coverage matched to BAL Single Part Flexible TDS — separate floor (5/4/3 m²/bag) and wall (10/7/5 m²/bag) rates by tile size
• Grout estimate using manufacturer formula (joint length × width × tile thickness × density 1.7 kg/L per Bostik TDS)
• Optional cost estimation with price-per-tile, price-per-bag inputs
• Clean breakdown of base tiles, waste tiles, and total
• Share results to text/email/messaging apps
CALCULATION ACCURACY
Built against UK industry standards: BS 5385-1:2018 wall and floor tiling, BAL adhesive technical datasheets, Bostik grout TDS, and TTA (The Tile Association) guidance. Tile size presets match Topps Tiles, Wickes, and B&Q retail standards.
WHO IT'S FOR
• Tilers and decorators sizing up jobs
• Home renovators planning bathrooms, kitchens, hallways
• Quantity surveyors estimating materials
• DIYers shopping at Wickes, B&Q, Topps Tiles, or trade merchants
OFFLINE READY
Calculate without an internet connection. Results saved nowhere — all numbers stay on your device.
DISCLAIMER
This calculator is a planning tool. Always cross-check critical material orders with your supplier or a qualified tradesperson. Wall mode does not subtract door or window openings — increase waste % or subtract openings manually for accurate net area.
What’s new
Version 1.0.0 · Updated May 6, 2026
First release. Floor and wall tiling, 14 UK tile size presets plus custom, adhesive + grout estimates per BAL/Bostik specs, cost estimation, share results.
Alternatives to Tiling Calculator
Looking for apps like Tiling Calculator? Here are 6 similar Android apps on Google Play. All of them are free to download.
-
Plastering Calculator
-
Paving Calculator
-
Fencing Calculator
-
Paint Calculator
-
Decking Calculator
-
Concrete Calculator
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| Tiling Calculator | – | Free | 100+ | May 6, 2026 | |
| Plastering Calculator | – | Free | 50+ | May 17, 2026 | Compare |
| Paving Calculator | – | Free | 50+ | May 16, 2026 | Compare |
| Fencing Calculator | – | Free | 50+ | May 15, 2026 | Compare |
| Paint Calculator | – | Free | 100+ | May 11, 2026 | Compare |
| Decking Calculator | – | Free | 100+ | May 3, 2026 | Compare |
| Concrete Calculator | – | Free | 100+ | Apr 27, 2026 | Compare |
Compare Tiling Calculator with the top alternatives: ratings, updates, ASO score and keyword gaps →