AppPage.net

Screenshots

  • PipeRun: Flowline Puzzles screenshot 1
  • PipeRun: Flowline Puzzles screenshot 2
  • PipeRun: Flowline Puzzles screenshot 3
  • PipeRun: Flowline Puzzles screenshot 4

About PipeRun: Flowline Puzzles

PipeRun is a challenging puzzle game where you rotate pipes to create a complete pipeline from source to destination. FEATURES: • Daily puzzles - New challenge every day • Multiple pipe types - Straight, bends, T-junctions, and more • Track your progress - Streaks and completion history • Custom puzzle editor - Create and share your own puzzles • Beautiful audio - Ambient music and sound effects • Clean interface - Simple, intuitive controls HOW TO PLAY: Tap pipes to rotate them and create a continuous path from the start to all endpoints. Every pipe must connect to solve the puzzle! Test your puzzle-solving skills with hundreds of levels and daily challenges.

Ratings & reviews

4.0

13 ratings

5 ★ 62% 4 ★ 15% 3 ★ 0% 2 ★ 8% 1 ★ 15%

What’s new

Version 3.6 · Updated August 26, 2026

Added the next batch of daily puzzles.

Play today's Sudoku puzzle

A quick 6×6 Sudoku every day; levels grow to the classic 9×9. A free daily puzzle from Fiplay, same board for everyone. It plays right here, no download.

More Sudoku and other daily puzzles on Fiplay →

App privacy

The developer, Gregory Wilknson, reported these privacy practices to Apple.

Data Not Collected

The developer does not collect any data from this app.

Alternatives to PipeRun: Flowline Puzzles

Looking for apps like PipeRun: Flowline Puzzles? Here are 6 similar apps on the App Store. The highest rated is Pipes: Connect the Flow (5.0/5), and all 6 are free to download.

PipeRun: Flowline Puzzles vs. alternatives
App Rating Price Last updated Compare
PipeRun: Flowline Puzzles 4.0 / 5 (13 ratings) Free August 26, 2026
Pipe turn: network puzzle 4.0 / 5 (1) Free Aug 26, 2026 Compare
Pipes: Connect the Flow 5.0 / 5 (1) Free Jul 18, 2026 Compare
Pipe Jewels™ 4.7 / 5 (1,444) Free Jul 2, 2026 Compare
Pipes 4.7 / 5 (184) Free Sep 15, 2025 Compare
Connect Water Pipes 4.5 / 5 (44) Free Mar 7, 2024 Compare
Star Battle: Grid Logic Puzzle 4.6 / 5 (65) Free Sep 17, 2026 Compare

Compare PipeRun: Flowline Puzzles with the top alternatives: ratings, updates, ASO score and keyword gaps →