AppPage.net

About RapidFlowLines BMX

RapidFlowLines BMX is a freestyle-focused digital BMX experience built around flow, timing, and creative movements. Featuring responsive bike control and stylized environments — from ramps to rails and transitions — every space is designed to support fluid motion and style. Two modes are available: Freeride, for untimed sessions, and Points Attack, where timing and precision affect your score. The control system allows combining rotations like flips and spins with tricks such as tailwhips, barspins, no-handers, inverts, and basic grinds, enabling varied and dynamic movement. Safety Disclaimer: All stunts in this game are simulated for entertainment purposes only. Do not attempt to replicate them in real life. Always ride responsibly and wear appropriate protective gear.

What’s new

Version 1.6 · Updated November 6, 2025

New maps

App privacy

The developer, ACTIVEARTIFICIALE S.R.L., reported these privacy practices to Apple.

Data Not Collected

The developer does not collect any data from this app.

Alternatives to RapidFlowLines BMX

Looking for apps like RapidFlowLines BMX? Here are 6 similar apps on the App Store. The highest rated is Street Lines: BMX (4.7/5), and all 6 are free to download.

RapidFlowLines BMX vs. alternatives
App Rating Price Last updated Compare
RapidFlowLines BMX 4.5 / 5 (2 ratings) Free November 6, 2025
Street Lines: BMX 4.7 / 5 (200) Free Jan 21, 2026 Compare
PureSkate 1+2 4.2 / 5 (5) Free Jan 12, 2025 Compare
BMX Mad Bicycle Bike Rider – Free Jan 26, 2025 Compare
Street Lines: Skateboard 4.5 / 5 (21) Free Jan 21, 2026 Compare
RampRider: Scooter Game 3.0 / 5 (2) Free Dec 13, 2025 Compare
Freerun AR 4.6 / 5 (19) Free Jul 27, 2026 Compare

Compare RapidFlowLines BMX with the top alternatives: ratings, updates, ASO score and keyword gaps →