AppPage.net

About Power Grid Inspection

Power Grid Inspection app is a perfect tool when it comes to performing power grid inspections. The app doesn’t require Internet connection to collect information. Power Grid Inspection app will help you evaluate any electric equipment, identify input and output voltage, current and perform a functional test.
This app can be 100% customized by Snappii to meet your business needs.
Summary app features include:
- Conduct power grid inspections
- Save completed inspections on your smartphone and tablet
- Modify saved inspections
- Share performed inspections as PDF and Excel reports
- Upload captured information to cloud drives
- Print reports
- Import your own fillable PDF forms to collect specific information
- Share fillable pdf forms
- Fill in inspector’s profile
- Sign inspection reports
- Work offline and online
Power Grid Inspection app can be further customized and re-designed by Snappii.

By downloading, you agree to the Terms of Use at https://www.snappii.com/policy

In addition to using free Power Grid Inspection App version you can get unlimited number of form submissions by subscribing via an optional In-App Purchase and remove all ads by purchasing onetime fee. Subscribe from your device and access these services via mobile app.

In-App Subscription Details:
• Ad Removal is $0.99 US dollars one-time fee
• Monthly Unlimited Form Submission Subscription to get is $11.99 US dollars per month
• Annual Unlimited Form Submission Subscription to get is $99.99 US dollars per year
• Payment will be charged to Account at confirmation of purchase
• No cancellation of the current subscription is allowed during active subscription period
• Account will be charged for renewal automatically

What’s new

Version 1.0.17 · Updated December 27, 2018

• User interface improvements • Bug fixes and performance enhancements

Alternatives to Power Grid Inspection

Looking for apps like Power Grid Inspection? Here are 6 similar Android apps on Google Play. The highest rated is Snappii Mobile Forms (4.3/5), and all 6 are free to download.

Power Grid Inspection vs. alternatives
App Rating Price Installs Last updated Compare
Power Grid Inspection – Free 100+ Dec 27, 2018
Construction Plans 3.2 / 5 Free 10,000+ – Compare
Job Estimates & Invoices 3.8 / 5 Free 50,000+ – Compare
Punch List and Issue Tracker 2.7 / 5 Free 10,000+ Jan 19, 2026 Compare
Snappii Mobile Forms 4.3 / 5 Free 10,000+ Oct 29, 2025 Compare
Fire Alarm Inspection Report 4.2 / 5 Free 1,000+ Apr 11, 2017 Compare
Construction Estimator App 3.5 / 5 Free 100,000+ Aug 26, 2025 Compare

Compare Power Grid Inspection with the top alternatives: ratings, updates, ASO score and keyword gaps →

Similar apps on Google Play