Concrete Calculator: Slabs
BRIGHTPATH FUNDING LLC Productivity In-app purchases
Cement, footing & cubic yards
- Downloads
- 8+
- on Google Play
- Price
- Free
- In-app purchases
- Updated
- Nov 12
- 2026 · v1.0.4
Screenshots
About Concrete Calculator: Slabs
How much concrete, and how many bags.
Pick a slab, a footing, a column or a flight of stairs, type the dimensions, and read the answer in cubic yards, cubic metres and cubic feet at once — with the bag count for 40, 60 and 80 lb bags beside it.
EVERY BOX SAYS ITS OWN UNIT
A slab is twelve feet long and four inches deep at the same moment, and no app should make you convert one into the other. Each box is labelled with the unit it wants. Type 12' 6", 12 6, 12.5 or 4 1/2 — all of them mean the same thing here, and a comma decimal works as well as a point.
WASTE, ADDED IN THE RIGHT ORDER
Spillage, an uneven subgrade and over-excavation are real, so the allowance goes on the volume before the bags are counted, never after. Bags always round up, because merchants sell whole ones.
STAIRS DONE PROPERLY
A flight poured solid is a staircase prism, not a box and not half of one: each step sits on the concrete of every step below it. Getting that wrong orders too little concrete, which is the expensive direction.
A COLUMN IS MEASURED ACROSS
An 8" tube is eight inches across, not eight inches of radius. Reading it the other way orders four times what the job needs.
WHEN A BAG COUNT STOPS BEING THE ANSWER
Past about a cubic yard the app says so. That is forty-odd bags and a ton and a half to carry; ready-mix is cheaper and very much faster, and an app that answers the arithmetic without saying that has not answered the question.
JOBS — THE PAID UNLOCK
A real job is never one pour. Save a job, add the slab, the forty feet of footing, the six piers and the landing, and read one total with each pour's own waste in it. Cost it at your delivered price per cubic yard. Get the rebar grid — counting the closing bar, which is the one everyone drops — and the mesh sheets, allowing for the overlap that makes a 5 × 7 sheet cover 4.5 × 6.5. And if you are mixing it yourself, the cement, sand, stone and water for a 1:2:3, 1:2:4 or 1:3:5 mix, batched to the dry volume rather than the wet one.
OFFLINE, AND IT STAYS THAT WAY
No account, no sign-in, no adverts, and not one network request. Saved jobs live on your phone and nowhere else. Nothing about you is collected, which is why the privacy label says so.
One payment for the unlock, yours forever. The calculator itself is free and always will be.
POUR
• Slab — Length · Width · Depth
• Footing — Length · Width · Depth
• Column — Diameter · Height · How many
• Stairs — Steps · Rise · Run · Width
• Concrete needed — cubic yards · cubic metres · cubic feet
• Bags · Waste allowance · Feet · Metres
JOBS
Cost a whole pour list, not one slab
• New job — Back garden
• Total · Price per cubic yard · Estimated cost
• Rebar and mesh · Bar spacing
• Mixing it yourself · Cement : sand : stone
Dry ingredients come to about half again the finished volume — the sand fills the gaps between the stones.
UNLOCK JOB LISTS AND REINFORCEMENT
Save a job, add every pour to it and read one total. Rebar and mesh counts, hand-mixing quantities, and cost per cubic yard. One payment, yours forever.
The calculator stays free, always.
Pick a slab, a footing, a column or a flight of stairs, type the dimensions, and read the answer in cubic yards, cubic metres and cubic feet at once — with the bag count for 40, 60 and 80 lb bags beside it.
EVERY BOX SAYS ITS OWN UNIT
A slab is twelve feet long and four inches deep at the same moment, and no app should make you convert one into the other. Each box is labelled with the unit it wants. Type 12' 6", 12 6, 12.5 or 4 1/2 — all of them mean the same thing here, and a comma decimal works as well as a point.
WASTE, ADDED IN THE RIGHT ORDER
Spillage, an uneven subgrade and over-excavation are real, so the allowance goes on the volume before the bags are counted, never after. Bags always round up, because merchants sell whole ones.
STAIRS DONE PROPERLY
A flight poured solid is a staircase prism, not a box and not half of one: each step sits on the concrete of every step below it. Getting that wrong orders too little concrete, which is the expensive direction.
A COLUMN IS MEASURED ACROSS
An 8" tube is eight inches across, not eight inches of radius. Reading it the other way orders four times what the job needs.
WHEN A BAG COUNT STOPS BEING THE ANSWER
Past about a cubic yard the app says so. That is forty-odd bags and a ton and a half to carry; ready-mix is cheaper and very much faster, and an app that answers the arithmetic without saying that has not answered the question.
JOBS — THE PAID UNLOCK
A real job is never one pour. Save a job, add the slab, the forty feet of footing, the six piers and the landing, and read one total with each pour's own waste in it. Cost it at your delivered price per cubic yard. Get the rebar grid — counting the closing bar, which is the one everyone drops — and the mesh sheets, allowing for the overlap that makes a 5 × 7 sheet cover 4.5 × 6.5. And if you are mixing it yourself, the cement, sand, stone and water for a 1:2:3, 1:2:4 or 1:3:5 mix, batched to the dry volume rather than the wet one.
OFFLINE, AND IT STAYS THAT WAY
No account, no sign-in, no adverts, and not one network request. Saved jobs live on your phone and nowhere else. Nothing about you is collected, which is why the privacy label says so.
One payment for the unlock, yours forever. The calculator itself is free and always will be.
POUR
• Slab — Length · Width · Depth
• Footing — Length · Width · Depth
• Column — Diameter · Height · How many
• Stairs — Steps · Rise · Run · Width
• Concrete needed — cubic yards · cubic metres · cubic feet
• Bags · Waste allowance · Feet · Metres
JOBS
Cost a whole pour list, not one slab
• New job — Back garden
• Total · Price per cubic yard · Estimated cost
• Rebar and mesh · Bar spacing
• Mixing it yourself · Cement : sand : stone
Dry ingredients come to about half again the finished volume — the sand fills the gaps between the stones.
UNLOCK JOB LISTS AND REINFORCEMENT
Save a job, add every pour to it and read one total. Rebar and mesh counts, hand-mixing quantities, and cost per cubic yard. One payment, yours forever.
The calculator stays free, always.
What’s new
Version 1.0.4 · Updated November 12, 2026
Slab, footing, column or stairs — cubic yards, cubic metres and the bag count, with the waste allowance already in it. Offline, no account, no adverts.