Muslim Watch 2
MagicTools Personalization
Muslim Watch 2
- Downloads
- 50+
- on Google Play
- Price
- $0.99
- No in-app purchases
- Updated
- Jan 4
- 2017 · v1.31
Screenshots
About Muslim Watch 2
Muslim Watch is an Android Wear watch face for wear 1.0 watches. It is compatible with the majority of Android wear watches in the market. It supports square and round watches, all resolutions included. The wear 2.0 version will come in soon.
- The compass will shows only on compass enabled watches.
- The location needs a connection to your phone, or a GPS enabled watch.
Muslim Watch support the following functions:
- Kabaa Direction
- North Direction
- Today Prayer Times
- Today Imsak & Sunrise Time
- Next Day Imsak & Fajr Time
- Map Location
- Islamic Calendar Dates
- Gregorian Calendar Date
- Time in Analog and Digital formats.
Recommendations:
- Be sure that your watch have a compass sensor.
- Enable location permission on your watch for this application.
- Enable location and Bluetooth on your phone.
- Calibrate your compass each time you feel that it is not showing the right north direction.
- The prayer times are computed based on general location. You could see some difference between the watch prayer times and the real location prayer times, as the method used to get prayer time is different. Please allow 5 to 15 minutes before making your prayer to be sure you are correct.
- If you disable your phone location, or your watch location, the Kaaba direction will disappear.
- If you have not compass hardware, the compass will disappear.
- The compass will shows only on compass enabled watches.
- The location needs a connection to your phone, or a GPS enabled watch.
Muslim Watch support the following functions:
- Kabaa Direction
- North Direction
- Today Prayer Times
- Today Imsak & Sunrise Time
- Next Day Imsak & Fajr Time
- Map Location
- Islamic Calendar Dates
- Gregorian Calendar Date
- Time in Analog and Digital formats.
Recommendations:
- Be sure that your watch have a compass sensor.
- Enable location permission on your watch for this application.
- Enable location and Bluetooth on your phone.
- Calibrate your compass each time you feel that it is not showing the right north direction.
- The prayer times are computed based on general location. You could see some difference between the watch prayer times and the real location prayer times, as the method used to get prayer time is different. Please allow 5 to 15 minutes before making your prayer to be sure you are correct.
- If you disable your phone location, or your watch location, the Kaaba direction will disappear.
- If you have not compass hardware, the compass will disappear.
Alternatives to Muslim Watch 2
Looking for apps like Muslim Watch 2? Here are 6 similar Android apps on Google Play. 3 of the 6 are free to download.
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| Muslim Watch 2 | – | $0.99 | 50+ | Jan 4, 2017 | |
| Muslim Watch 4 | – | 0.99 USD | 100+ | Jan 4, 2017 | Compare |
| U.S.A Watch | – | Free | 100+ | Jan 4, 2017 | Compare |
| Muslim Watch 3 | – | 0.99 USD | 10+ | Jan 4, 2017 | Compare |
| Muslim Watch 1 | – | 0.99 USD | 100+ | Jan 7, 2017 | Compare |
| New York Watch | – | Free | 1,000+ | Jan 4, 2017 | Compare |
| Paris Watch | – | Free | 100+ | Jan 4, 2017 | Compare |
Compare Muslim Watch 2 with the top alternatives: ratings, updates, ASO score and keyword gaps →
Similar apps on Google Play
- Muslim Watch 4
- U.S.A Watch
- Muslim Watch 3
- Muslim Watch 1
- New York Watch
- Paris Watch
- Toronto Watch
- Dubai Watch
- Magic Shape Puzzle 2
- Magic Shape Puzzle 1
- Magic Shape Puzzle 3
- Magic Slide Puzzle A Fishes 2
- Magic Slide Puzzle B Fishes 1
- Magic Slide Puzzle A Fishes 1
- Magic Slide Puzzle Free 2
- Magic Slide Puzzle D.Animals1
- Magic Slide Puzzle Insects 1
- Magic Slide Puzzle Flowers1
- Magic Slide Puzzle Mushrooms 2
- MagicCalc Lite, Graphing Calc
- Magic Slide Puzzle Shells
- Magic Slide Puzzle W.Animals 1
- Magic Slide Puzzle Letters