Flowline: Pipe Connect
Supreme Port Casual Contains ads
Draw pipe paths so every colored dot flows to its twin without crossing.
- Downloads
- 26+
- on Google Play
- Price
- Free
- No in-app purchases
- Updated
- Apr 20
- 2026 · v1.0.0
Screenshots
About Flowline: Pipe Connect
Flowline: Pipe Connect is a minimalist puzzle game about drawing paths. Each level presents pairs of colored dots scattered across a grid; your job is to link each pair without any paths crossing or overlapping. Sounds easy until the grid fills with a dozen colors, or the board introduces locked cells, bridges, and warp tiles. Hundreds of handcrafted stages start from breezy warm-ups and ramp into devious late-game puzzlers that will make you stop and stare. A hint system, undo button, and daily challenges keep the experience welcoming for beginners and satisfying for puzzle veterans alike.
Play today's Frostfire puzzle
Balance fire and ice: half of each in every row and column. A free daily puzzle from Fiplay, same board for everyone. It plays right here, no download.
Alternatives to Flowline: Pipe Connect
Looking for apps like Flowline: Pipe Connect? Here are 6 similar Android apps on Google Play. All of them are free to download.
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| Flowline: Pipe Connect | – | Free | 10+ | Apr 20, 2026 | |
| Tap Arrow Away | – | Free | 50+ | Apr 27, 2026 | Compare |
| Stroke Puzzle Enhanced | – | Free | 10+ | – | Compare |
| Flip Puzzle | – | Free | 10+ | – | Compare |
| Precision Ball | – | Free | 1,000+ | Apr 27, 2026 | Compare |
| Candy Mahjong 3D | – | Free | 100+ | Apr 20, 2026 | Compare |
| Block Nest | – | Free | 5,000+ | Apr 3, 2026 | Compare |