Starglax: Galaxy Bullet Hell
IOCODO LLC Action In-app purchases Contains ads
Neon bullet hell shmup. 26 sectors, colossal bosses, one-thumb arcade skill.
- Downloads
- 26+
- on Google Play
- Price
- Free
- In-app purchases
- Updated
- Oct 28
- 2026 · v1.0.15
Screenshots
Save to PinterestAbout Starglax: Galaxy Bullet Hell
STARGLAX: Neon Bullet Hell
Cut through swarms of hostile ships across 26 deep-space sectors. A pure vertical shoot-em-up built for one thing: the perfect run.
▶ 26-SECTOR CAMPAIGN
25 sectors plus an EX-26 true finale, from the asteroid belt to the galactic core. Every sector ends in a massive boss, and the deeper you push the harder they hit.
▶ 5 BOSS FAMILIES
Sentinel spiral-cannons, Vanguard strafers, Dreadnought war cruisers, Leviathan splitters, Hydra cephalopods. Each boss escalates through three attack phases: spiral bursts, vertical rain, radial fans, laser beams, split mechanics and more.
▶ 16 ENEMY TYPES
From linear Drifters to cloaking Phantoms, mine-dropping Bombers, healing Clerics, laser-firing Pyros and bullet-deflecting Splicers. Every enemy wants a different counter.
▶ GRAZE & COMBO SCORING
Skim enemy bullets at near-miss range for bonus score. Keep your kill chain alive to hit a x3.0 combo. Every run is a score attack.
▶ SKILL TREE & DRAFT
Spend stars on permanent upgrades across five branches: extra drones, wider pickup range, bomb-freeze, weapon overdrive and more. Mid-run, weapon drops and EVOLVE cards reshape your loadout on the fly. Five weapons, five tiers each. No two runs play the same.
▶ 3 DIFFICULTIES + NOVA LOOP
Easy, Normal, Hard. Clear the campaign to unlock Nova Loop, a New Game+ that turns everything up. Each tier opens a fresh medal set to chase.
▶ LEADERBOARDS
Compete for the highest score and the deepest sector cleared on the in-game world boards. No sign-in, no profile to create.
Playable in English, Spanish, Portuguese, French and Italian. One thumb to move, firing is automatic. Free to play, pure arcade skill.
Cut through swarms of hostile ships across 26 deep-space sectors. A pure vertical shoot-em-up built for one thing: the perfect run.
▶ 26-SECTOR CAMPAIGN
25 sectors plus an EX-26 true finale, from the asteroid belt to the galactic core. Every sector ends in a massive boss, and the deeper you push the harder they hit.
▶ 5 BOSS FAMILIES
Sentinel spiral-cannons, Vanguard strafers, Dreadnought war cruisers, Leviathan splitters, Hydra cephalopods. Each boss escalates through three attack phases: spiral bursts, vertical rain, radial fans, laser beams, split mechanics and more.
▶ 16 ENEMY TYPES
From linear Drifters to cloaking Phantoms, mine-dropping Bombers, healing Clerics, laser-firing Pyros and bullet-deflecting Splicers. Every enemy wants a different counter.
▶ GRAZE & COMBO SCORING
Skim enemy bullets at near-miss range for bonus score. Keep your kill chain alive to hit a x3.0 combo. Every run is a score attack.
▶ SKILL TREE & DRAFT
Spend stars on permanent upgrades across five branches: extra drones, wider pickup range, bomb-freeze, weapon overdrive and more. Mid-run, weapon drops and EVOLVE cards reshape your loadout on the fly. Five weapons, five tiers each. No two runs play the same.
▶ 3 DIFFICULTIES + NOVA LOOP
Easy, Normal, Hard. Clear the campaign to unlock Nova Loop, a New Game+ that turns everything up. Each tier opens a fresh medal set to chase.
▶ LEADERBOARDS
Compete for the highest score and the deepest sector cleared on the in-game world boards. No sign-in, no profile to create.
Playable in English, Spanish, Portuguese, French and Italian. One thumb to move, firing is automatic. Free to play, pure arcade skill.
What’s new
Version 1.0.15 · Updated October 28, 2026
- A short privacy notice, shown once, with a link to Privacy choices - In the EU, anything priced in stars also shows its cost in your currency - Clearer texts in every language, plus bug fixes
Alternatives to Starglax: Galaxy Bullet Hell
Looking for apps like Starglax: Galaxy Bullet Hell? Here are 6 similar Android apps on Google Play. The highest rated is Dungeon Tracer: Puzzle RPG (4.6/5), and 1 of the 6 are free to download.
-
Alchemic Cauldron
-
Brick Run
-
Dungeon Tracer: Puzzle RPG 4.6
-
华容道(Klotski)
-
1945 Sky Shooter: Premium 3.6
-
Bricks Ball Crusher 4.5
| App | Rating | Price | Installs | Last updated | Compare |
|---|---|---|---|---|---|
| Starglax: Galaxy Bullet Hell | – | Free | 10+ | Oct 28, 2026 | |
| Alchemic Cauldron | – | 1.99 USD | 10+ | Sep 30, 2026 | Compare |
| Brick Run | – | 3.99 USD | 10+ | – | Compare |
| Dungeon Tracer: Puzzle RPG | 4.6 / 5 | 0.99 USD | 5,000+ | Sep 15, 2026 | Compare |
| 华容道(Klotski) | – | 0.99 USD | 0+ | Mar 13, 2026 | Compare |
| 1945 Sky Shooter: Premium | 3.6 / 5 | 0.49 USD | 10,000+ | Aug 24, 2026 | Compare |
| Bricks Ball Crusher | 4.5 / 5 | Free | 10,000,000+ | Apr 29, 2026 | Compare |
Similar apps on Google Play
- Alchemic Cauldron
- Brick Run
- Dungeon Tracer: Puzzle RPG
- 华容道(Klotski)
- 1945 Sky Shooter: Premium
- Bricks Ball Crusher
- Brick Breaker: Legend Balls
- Breach Wanderers: Deckbuilder
- LASERBREAK - Physics Puzzle
- Glyph
- [365fun] Mini Fighter
- LASERBREAK 2 - Physics Puzzle
- Raid Royal: Tower Defense
- Rite of Passage: Ember Lake
- Bricks Ball Puzzle