Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!
NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.
NOTE: Locations are sent by SMS message with a link to Google Maps.
Models:
LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.
LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.
Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.
Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.
Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.
Main Features:
- Multi-user support
- Multi-device support
- Easy swipe between devices
- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian
- Heartbeat / Auto-track from once per 1-30 days
- Excessive speed alert w/ selectable threshold
- Low car battery alert
- 2 selectable Geo-fences w/ alerts
- Selectable device icon
- Selectable control screen skin
- Panic from button in car or from app
- Check SIM balance (outside the USA only)
- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).
Optional LINKR-MIC required.
- Lock control
- Unlock control
- Trunk release
- Start / Stop Engine (optional remote start system required)
- 2 Auxiliary functions
- Dedicated starter disable function
- Assign up to 5 alert receivers
Keep connected to your friends and family through SOCiOST. Interact with your...
COGITO is a free self-help app for people with or without psychological...
Gank is a content membership platform that helps content creators accept donations,...
Bosslike is a simple social networking task exchange platform! Complete users tasks,...
Linktree is the original and most popular link in bio tool, used...
Build and manage your website and online store from anywhere. build your...
Created with AppPage.net
Similar Apps - visible in preview.